Zoning Permit No.                                                                                                                                             

 

 
 

 


APPLICATION for a ZONING PERMIT

In Accordance with Chapter 18 of the Zoning Ordinance

Baroda Township, Berrien County, Michigan

 

Name of Applicant:                                                                   Phone:                                                 

Applicant address:                                                                                                                               

City: _______________ State: ______ Zip:                  Phone:                                                            

 

Property address:                                                                                                                                

 

Permanent Parcel Number:                                                                   Zoning District:            

If a structure, give dimensions:                                                                                                  

Setbacks:         front                             rear                              side                              side                 

 

Non-Residential

Name of business (if applicable):                                                                                                          

 

Existing use:                                                                                                                                         

 

Explain the proposed use:                                                                                                                    

______________________________________________________________________________

______________________________________________________________________________

______________________________________________________________________________

 

A SITE PLAN MUST ACCOMPANY THIS APPLICATION, and include the following information:


1.      dimensions of lot and acreage;

2.      location with distance to lot lines of all existing and proposed structures;

3.      setbacks as measured in feet & inches

4.      dimensions of all existing and proposed structures;

5.      distance between all existing and proposed structures;

6.      location of all roads bordering or on the property, all driveways, parking areas and pavement;

7.      location of any lakes, rivers, streams or wetlands on or near the property;

8.      location of any easements on the property;

9.      indication of north on the drawing;


 

Applicant’s Signature                                                                                        date______________

 

Property Owner’s Signature (Required)________________________________date_____________

 

Property Owner’s Address__________________________________phone_________________

 

It is the applicant’s responsibility to meet the requirements of the Township Zoning Ordinance in all respects and to provide the necessary information to the Township for approval.  Copies of the Ordinance may be obtained from the Zoning Department.  By signing, permission is granted for Township staff to enter the subject property for purposes of gathering information to review this request.  A Zoning Permit MUST be obtained prior to occupying, operating or use.  Please be prepared to have a photocopy of your driver's license taken.

 

 

 

 

BARODA TOWNSHIP

ZONING AND BUILDING PERMIT PROCEDURES

 

Step 1                     Apply for a secure and satisfactory perk test and septic system layout from the Berrien County Health Department, 2106 S. M 139, Benton Harbor, MI 49022; Phone (269) 927-5623 or a sanitary sewer system tap in permit from the appropriate sewer district (If applicable).

 

                                Apply for and secure a driveway permit from the Berrien County Road Commission 9210 Hills Rd, Baroda, MI  49101 of PO Box 768 Benton Harbor MI  49022; Phone (269) 925-1196 (If Applicable).

 

Step 2                     Complete a zoning permit application and building permit application, and submit them to the township clerk along with the items listed below. (As Applicable)

1.                    A copy of the septic tank or sewage tap permit.

2.                    A copy of the driveway permit.

3.                    A copy of the legal description of the lot or parcel.

4.                    A sketch map showing the proposed improvement or use on the property.

5.                    A set of building plans (These will be retained by the township).

6.                    The zoning permit fee of $25.00

 

Step 3                     Upon receipt of the zoning permit, stake out the building on the property and contact the Zoning Administrator for an inspection.

 

Step 4                     Upon sign off of the zoning permit application by the Zoning Administrator, submit it to the Building Inspector for review and issuance of the building permit.

 

 

Phone                     Zoning Administrator                         (269) 429-1589       408-1929 Jim Pheifer

Numbers               Building Inspector                               (269) 422-1568       Howard Gaul

                                Electrical Inspector                              (269) 422-1248       Edward Steinke

                                Plumbing and Mechanical                  (574) 215-0757       Ed Wainwright

                               

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

For Office Use Only

 

Date of application:                               Fee due with application:                       Date paid:                    

******************************************************************************

Zoning Administrator or designee: Proposed use allowed: yes                no                               

 

Complies with Ordinance Section:                                 SUP required?              Obtained?                  

******************************************************************************

 

Date:                            Comments:                                                                                                      

 

                                                                                                                                                           

 

                                                                                                                                                           

 

                                                                                                                                                           

 

                                                                                                                                                           

Inspections:

 

Date:                            Comments:                                                                                                      

 

                                                                                                                                                           

 

                                                                                                                                                           

 

Date:                            Comments:                                                                                                      

 

                                                                                                                                                           

 

                                                                                                                                                           

 

Temporary Zoning Compliance Permit needed?                                                                        

 

If yes, reason:                                                                                                              

 

            Pended for what date:                                                                                                  

 

Zoning Compliance Permit approved:                                                    Date:                           

 

Conditions:                                                                                                                                          

 

Zoning Administrator or designee signature:                                                                                          

 

Date copy of result sent to applicant: